Archive for August, 2015

DEENA – ‘TURPENTINE’ AUSTRALIAN TOUR ANNOUNCEMENT

FB Event: https://www.facebook.com/events/820579238040328/ Deena’s new single Turpentine is a brooding look into the consuming power of darkness. Through the lens of a haunted modern blues, Deena paints the portrait of a user and abuser whose destructive habits cause nothing but what they promise. From the opening verse, the songstress, alone with her electric guitar, sings […]

Read More...

Day 11 – Inlay Work & Checking Out

Spent most of the day routing out the channel for my inlays to sit in. That was a fidgety process – you had to be careful not to take out too much, otherwise you’ll see the gaps that were being filled by the epoxy. Obviously, being handmade and not using a CNC machine does mean […]

Read More...

Day 9 – Back & Top Bracing

Day 9 was all about making the bracing, trimming off the excess lengths and chiseling out the check out points in the kerfing for the bracing to fit within the sides. As the back bracing was all ready and glued on, all I needed to do was trim off the excess lengths that were actually […]

Read More...