Day 9 was all about making the bracing, trimming off the excess lengths and chiseling out the check out points in the kerfing for the bracing to fit within the sides. As the back bracing was all ready and glued on, all I needed to do was trim off the excess lengths that were actually […]
Read More...Posts Tagged “dremel”
Day 8 – Side Prepping & Putting in the Rosette Inlay
The sides were placed into the jig ready for me to plane down evenly so that the back can be put on. When we made the sides we left quite a bit of leeway in case of any measurement mishaps. This was Tor’s amazing inlay work. He is sanding down the fretboard to get the […]
Read More...